How to get an ADU permit in San Diego County, step by step

With a pre-approved plan, you pick the plan, add your site details, apply for a building permit, and build. Applications using pre-approved plans get a streamlined 30-day approval under state law.

Last checked: November 2026

  1. Check your lot. Make sure your property is residential and has (or will have) a main house.
  2. Pick a plan your city accepts, or hire a designer.
  3. Add site-specific items: site plan, utilities, and a soils report or grading plan if your city requires it.
  4. Apply for the building permit through your city's portal.
  5. Pay fees. No impact fees under 750 sq ft; permit fees still apply.
  6. Build and pass inspections.

City notes

  • The county's old ADU fee waiver ended on January 9, 2024, so normal permit fees apply now. (Unincorporated San Diego County)
  • The city accepts County of San Diego, Chula Vista and Encinitas pre-approved plans. Applications using them get a 30-day review. (City of San Diego)
  • Permits for most ADUs cost about $2,000 to $4,000, depending on size. Many ADUs are exempt from impact fees. (Carlsbad)
  • Ten plan options are available to download. Plan check fees are waived, but permit and inspection fees still apply. (Vista)
  • A soils report is required unless footings go at least 24 inches into solid soil. Grading review must be cleared before plans are accepted. (Vista)
  • If your lot is in the coastal zone, a coastal permit for an ADU costs $1,000, plus more if extra reviews are needed. (Imperial Beach)
  • You still provide site soils information, and homes in very high fire severity zones have extra requirements. (Poway)
  • Santee's ADU fee waiver ended on September 27, 2024, so normal permit fees apply. (Santee)
  • Under state law, applications using pre-approved plans get a streamlined 30-day approval. (Lemon Grove)
  • California's housing department reviewed Coronado's ADU ordinance in a December 10, 2025 letter. (Coronado)
  • All of Solana Beach is in the Coastal Zone, so every building permit needs California Coastal Commission approval first. (Solana Beach)
  • Each submittal or resubmittal goes through a 30-day review period. (Solana Beach)
  • New construction taller than 16 feet needs a Structure Development Permit and a View Assessment. (Solana Beach)
  • Projects must meet grading permit exemption requirements, and you submit the grading exemption form included in each set. (Santa Ana)
  • The city offers a pre-approved prototype ADU plan free of charge, in three architectural styles, with a streamlined permit process. (Huntington Beach)
  • The plans are city-owned drawings already reviewed by the Building and Planning Divisions. They are not pre-permitted, so you still apply for a permit. (Westminster)
  • The city's standard plan list is marked coming soon. Pre-approved plans must still be submitted with a building permit application for site-specific review. (Irvine)
  • All ADU permit applications must be submitted in person at City Hall, 100 Civic Center Drive. (Lake Forest)
  • The County of San Diego's pre-approved plans are accepted by La Habra for plan check and permits. You add La Habra project details like climate zone, BMPs and architectural compatibility. (La Habra)
  • Replacing a detached garage with an ADU needs a demolition permit, reviewed and issued along with the ADU permit. (Buena Park)
  • Permit Ready ADU plans are free to the public, but you still pay for submission, construction and site-specific work. (Unincorporated Riverside County)
  • First plan review takes 3 business days for pre-approved plans. Later reviews, if needed, take 10 business days. (Riverside (city))
  • Because the plans are pre-approved by the Building and Planning Divisions, permits move faster and you save on preconstruction fees. (Jurupa Valley)
  • Questions go to permitcounter@moval.org or 951-413-3350, option 5. (Moreno Valley)
  • If you hire a designer to change them, they lose pre-approved status and need full review. (Pico Rivera)
  • A Hold Harmless Agreement goes in with the permit application, and each ADU needs its own address. (Santa Monica)
  • Pre-approved ADU plans can be approved over the counter at the Permit Center, and a permit can be issued the same day. (Long Beach)
  • The library includes ADU designs reviewed by city staff, including one the city created itself. (Burbank)
  • You may still need grading, drainage, a soils report, retaining walls or fire sprinklers depending on your site. (Torrance)
  • Approved plans can't be modified at permit time. If they are, they go through regular review with full plan check fees. (El Segundo)
  • You submit a Hold Harmless Agreement, OCFA form, city ADU questionnaire and a soils report. (Laguna Hills)
  • Applications using pre-approved plans are filed through the city's online Permit Center and need much less staff review. (Los Alamitos)
  • You apply online using the 'New Accessory Dwelling Unit (City Pre-Approved Plans)' permit type. (Cathedral City)