How to get an ADU permit in San Diego County, step by step
With a pre-approved plan, you pick the plan, add your site details, apply for a building permit, and build. Applications using pre-approved plans get a streamlined 30-day approval under state law.
Last checked: November 2026
- Check your lot. Make sure your property is residential and has (or will have) a main house.
- Pick a plan your city accepts, or hire a designer.
- Add site-specific items: site plan, utilities, and a soils report or grading plan if your city requires it.
- Apply for the building permit through your city's portal.
- Pay fees. No impact fees under 750 sq ft; permit fees still apply.
- Build and pass inspections.
City notes
- The county's old ADU fee waiver ended on January 9, 2024, so normal permit fees apply now. (Unincorporated San Diego County)
- The city accepts County of San Diego, Chula Vista and Encinitas pre-approved plans. Applications using them get a 30-day review. (City of San Diego)
- Permits for most ADUs cost about $2,000 to $4,000, depending on size. Many ADUs are exempt from impact fees. (Carlsbad)
- Ten plan options are available to download. Plan check fees are waived, but permit and inspection fees still apply. (Vista)
- A soils report is required unless footings go at least 24 inches into solid soil. Grading review must be cleared before plans are accepted. (Vista)
- If your lot is in the coastal zone, a coastal permit for an ADU costs $1,000, plus more if extra reviews are needed. (Imperial Beach)
- You still provide site soils information, and homes in very high fire severity zones have extra requirements. (Poway)
- Santee's ADU fee waiver ended on September 27, 2024, so normal permit fees apply. (Santee)
- Under state law, applications using pre-approved plans get a streamlined 30-day approval. (Lemon Grove)
- California's housing department reviewed Coronado's ADU ordinance in a December 10, 2025 letter. (Coronado)
- All of Solana Beach is in the Coastal Zone, so every building permit needs California Coastal Commission approval first. (Solana Beach)
- Each submittal or resubmittal goes through a 30-day review period. (Solana Beach)
- New construction taller than 16 feet needs a Structure Development Permit and a View Assessment. (Solana Beach)
- Projects must meet grading permit exemption requirements, and you submit the grading exemption form included in each set. (Santa Ana)
- The city offers a pre-approved prototype ADU plan free of charge, in three architectural styles, with a streamlined permit process. (Huntington Beach)
- The plans are city-owned drawings already reviewed by the Building and Planning Divisions. They are not pre-permitted, so you still apply for a permit. (Westminster)
- The city's standard plan list is marked coming soon. Pre-approved plans must still be submitted with a building permit application for site-specific review. (Irvine)
- All ADU permit applications must be submitted in person at City Hall, 100 Civic Center Drive. (Lake Forest)
- The County of San Diego's pre-approved plans are accepted by La Habra for plan check and permits. You add La Habra project details like climate zone, BMPs and architectural compatibility. (La Habra)
- Replacing a detached garage with an ADU needs a demolition permit, reviewed and issued along with the ADU permit. (Buena Park)
- Permit Ready ADU plans are free to the public, but you still pay for submission, construction and site-specific work. (Unincorporated Riverside County)
- First plan review takes 3 business days for pre-approved plans. Later reviews, if needed, take 10 business days. (Riverside (city))
- Because the plans are pre-approved by the Building and Planning Divisions, permits move faster and you save on preconstruction fees. (Jurupa Valley)
- Questions go to permitcounter@moval.org or 951-413-3350, option 5. (Moreno Valley)
- If you hire a designer to change them, they lose pre-approved status and need full review. (Pico Rivera)
- A Hold Harmless Agreement goes in with the permit application, and each ADU needs its own address. (Santa Monica)
- Pre-approved ADU plans can be approved over the counter at the Permit Center, and a permit can be issued the same day. (Long Beach)
- The library includes ADU designs reviewed by city staff, including one the city created itself. (Burbank)
- You may still need grading, drainage, a soils report, retaining walls or fire sprinklers depending on your site. (Torrance)
- Approved plans can't be modified at permit time. If they are, they go through regular review with full plan check fees. (El Segundo)
- You submit a Hold Harmless Agreement, OCFA form, city ADU questionnaire and a soils report. (Laguna Hills)
- Applications using pre-approved plans are filed through the city's online Permit Center and need much less staff review. (Los Alamitos)
- You apply online using the 'New Accessory Dwelling Unit (City Pre-Approved Plans)' permit type. (Cathedral City)